Gallery Language

No.19Fuqing Rd,Shanghai China

E-mail: info@clirik.com Tel: 86-21-2023 6178 Fax: 86-21-5897 4855

NEWS&EVENTS

HOME > NEWS&EVENTS >
What Parts of the Coal Pulverizer Need to Examine? 2013-09-24 10:19

How to maintenance the coal pulverizer?

1. Check connections of various components and presence of loose, damage.
2. The control cabinet of the specialist is responsible for operation and maintenance.
3. Every six months telemetry insulation resistance, handle in time when problems found.
4. Regularly check ark in the ark, to keep the instrument display is clear and bright, flexible operating handle movement, contactor, the main electric shock, no dust.

How to maintenance the coal pulverizer

1. When the element damage change, should replace the corresponding components, cannot do STH without authorization to increase capacity.
2. When the grid voltage is less than 10% when should stop working.
3. The motor of each circuit should be timely maintenance, found, high temperature when the current is too large, should stop.
4. After each circuit breaker cut off, should find out the reason and then close the air switch, it is strictly prohibited to open blindly.

Some details in daily use:

1.When there is abnormal sound equipment, timely stop check.
2, To ensure the cleaning of equipment on a regular basis to clean dust and corrosion substance, so as not to damage equipment.
3, The equipment is in use process, regularly give some lubricating oil on friction part, in order to ensure the overall stability of ultrafine grinding.
4, Equipment during startup and shutdown, in strict accordance with the correct order.
5,The operator of coal pulverizer must go through strict training before using, after training, the operator, to the actual computer operating practice, after reaching requirements, in the actual production.

About US | Products | News | Project Case | Contact | Site Map

© 2013 Copyright by Shanghai Clirik Machinery Co., Ltd.